CIGRÉ Working Groups (WGs)

CIGRÉ Working Groups (WGs)

Working Groups undertake research on behalf of Study Committees. WGs have a work to a pre-defined scope and time period. Working Group members are nominated by National Committees (NCs).  CIGRÉ Study Committees regularly form new Working Groups and the latest list of newly formed Working Groups can be found here.

The list below outlines members of CIGRÉ Ireland who are currently participating on CIGRÉ Working Groups.

Study Committee Category: Equipment ( A )

 

Study Committee A1: Rotating electrical machines
SC Representative   Bernard O’Sullivan
Working Group No. Working Group Title WG Terms of Reference (TOR) Irish Representative Year appointed to WG
WG A1.29 Guide on new generator-grid interaction requirements WG A1.29 TOR M.Ryan 2010
WG A1.34 Testing Voltage of doubly-fed asynchronous generator-motor rotor windings for pumped storage system WG A1.34 TOR J.Doyle 2011
WG A1.37 Turbogenerator Stator Winding Support System Experience WG A1.37 TOR B.O’Sullivan 2012
WG A1.45 Guide for Determining the Health Index of Large Electric Motors WG A1.45 TOR P. Kelly 2013
JWG A1-C4.52 Wind generators and frequency-active power control of power systems JWG A1-C4.52 TOR Dr. D.Cashman
Dr. D.Flynn
2015
WG A1.54 Impact of Flexible Operation on Large Motors WG A1.54 TOR J. Doyle (Convenor) 2015
Study Committee A2: Transformers
SC Representative   Tim Noonan
Working Group No. Working Group Title WG Terms of Reference (TOR) Irish Representative Year appointed to WG
JWG A2/D1.46 Field experience with transformer solid insulating ageing markers JWG A2/D1.46 TOR B. Diggin 2011
WG A2.49 Condition assessment of power transformers WG A2.49 TOR J. Carpenter 2013
JWG A2/D1.51 Improvement to PD measurements for Factory and Site Acceptance Test JWG A2/D1.51 TOR J. Nixon 2014
WG A2.53 Objective interpretation methodology for the mechanical condition assessment of transformer windings using Frequency Response Analysis WG A2.53 TOR J. Carpenter  2014
WG A2.55 Life Extension of oil filled Transformers and Shunt Reactors WG A2.55 TOR S. Flood 2011
WG A2.56 Power Transformer Efficiency WG A2.56 TOR A. Walsh 2016
WG A2.58 Installation and Pre-Commissioning of Transformers and Shunt Reactors WG A2.58 TOR A. Harte  2017
WG A2.59 On-Site Assembly, On-Site Rebuild, and On-Site High Voltage Testing of Power Transformers WG A2.59 TOR T. Noonan  2017
A2 Advisory Group Advisory Group on Utilisation B. Diggin 2016
Study Committee A3: High voltage equipment
SC Representative   Robert LeRoux
Working Group No. Working Group Title WG Terms of Reference (TOR) Irish Representative Year appointed to WG
WG A3.35 Guidelines and best practices for the commissioning of controlled switching projects WG A3.35 TOR E. Cowhey 2013
JWG A3/B5/C4.37 System conditions for and probability of Out-of-Phase JWG A3/B5/C4.37 TOR S. McGuinness 2015
WG A3.38 Shunt Capacitor Switching in distribution and transmission systems-Verif by tests & performance in service WG A3.38 TOR E. Boyle 2016
WG A3.39 Application and field experience with Metal Oxide Surge Arresters WG A3.39 TOR R. Le Roux 2016

 

Study Committee Category: Sub-systems ( B )

 

Study Committee B1: Insulated cables
SC Representative   Patrick O’Rourke
Working Group No. Working Group Title WG Terms of Reference (TOR) Irish Representative Year appointed to WG
WG B1.48 Trenchless Technologies WG B1.48 TOR E. Butler, E. Bergin 2014
WG B1.52 Cable fault location WG B1.52 TOR R. Donaghy (Convenor), P. O’Rourke 2013
WG B1.55 Recommendations for additional testing for submarine cables from 6 kV (Um=7.2 kV) up to 60 kV (Um=72.5 kV) WG B1.55 TOR R.McGuirk 2016
WG B1.58 Condition Assessment and Diagnostic Methods to support Asset Management of MV Cable Networks WG B1.58 TOR J. O’Shaughnessy  2017
WG B1.60 Maintenance of HV Cable Systems WG B1.60 TOR  C. Aherne  2017
WG B1.61 Installation of HV Cable Systems WG B1.61 TOR J. Martin  2017
B1 CAG Customer Advisory Group (SAG) E. Bergin
Study Committee B2: Overhead lines
SC Representative   Tim Condon
Working Group No. Working Group Title WG Terms of Reference (TOR) Irish Representative Year appointed to WG
WG B2.57 Survey of operational composite insulator experience and application guide for composite insulators WG B2.57 TOR T. Condon 2014
WG B2.58 Vibration Modeling of High Temperature Low Sag conductors –Self damping characterization WG B2.58 TOR T. Kavanagh 2015
WG B2.61 Transmission Line Structures with Fiber Reinforced Polymer (FRP) Composites WG B2.61 TOR J. Lucey (Full), R. Geary (Corresp) 2015
 WG B2.66 Safe handling and installation guide for high temperature low sag (HTLS) conductors  WG B2.66 TOR  T. Kavanagh  2016
 WG B2.67 Assessment and Testing of Wood and Alternative Material Type Poles  WG B2.67 TOR  D. Tuohy  2017
Study Committee B3: Substations
SC Representative   Colm Twomey
Working Group No. Working Group Title WG Terms of Reference (TOR) Irish Representative Year appointed to WG
WG B3.39 Impact of NCIT applications on HV Gas Insulated Switchgear WG B3.39 TOR D. Dorgan 2014
WG B3.42 Reliability analysis and design guidelines for LV AC/DC Auxiliary Systems WG B3.42 TOR CJ Roy 2015
WG B3.46 Guidelines for Safe Work Methods in Substations WG B3.46 TOR D. Quinn, H. Cunningham (Corresp.) 2016
WG B3.48 Asset health indices for equipment in existing substations WG B3.48 TOR J. Bednarik (Convenor), L. McCartney 2017
WG B3.49 Review of substation busbar component reliability WG B3.49 TOR B. Perry 2017
WG B3.50 Concepts for on-site HV testing of GIS after installation, extension, retrofit or repair WG B3.50 TOR D. Dorgan 2018
WG B3.51 Service continuity guide for the maintenance, repair and extension of HV GIS WG B3.51 TOR C. Farrell, B. Linehan 2018
Study Committee B4: HVDC and Power electronics
SC Representative   Geoff Love
Working Group No. Working Group Title WG Terms of Reference (TOR) Irish Representative Year appointed to WG
WG B4.66 Harmonics and filtering for HVDC in staggered installations WG B4.66 TOR N. Cunniffe 2014
WG B4.67 Harmonic aspects of VSC HVDC and appropriate harmonic limits WG B4.67 TOR B. Kelly, S. McGuinness 2014
WG B4.68 DC harmonics and Filters WG B4.68 TOR C. McNamee 2014
WG B4.76 DC-DC converters in HVDC Grids and for connections to HVDC systems WG B4.76 TOR A. Geoghegan 2017
Study Committee B5: Protection and Automation
SC Representative   Sean McGuinness
Working Group No. Working Group Title WG Terms of Reference (TOR) Irish Representative Year appointed to WG
WG B5.50 IEC 61850 Based Substation Automation Systems – Users’ expectations and stakeholders interactions WG B5.50 TOR B. Cafferty (Corresp.) 2012
WG B5.51 Requirements and use of remotely accessed information for SAS maintenance and operation WG B5.51 TOR G. Rooney 2012
WG B5.53 Test Strategy for Protection, Automation and Control (PAC) functions in a full digital substation based on IEC 61850 applications WG B5.53 TOR N. Kearns 2014
WG B5.55 Application of Travelling Wave Technology for Protection and Automation WG B5.55 TOR A. Chabrol 2015
WG B5.57 New challenges for frequency protection WG B5.57 TOR D. Catanase, M. Mousaviagah (Observer) 2016
WG B5.58 Faster protection and network automation systems: implications and requirements WG B5.58 TOR R. Kelly, S. McGuinness (Corresp.) 2016
JWG B5/C4.61 Impact of Low Inertia Network on Protection and Control JWG B5/C4.61 TOR A. Kelly 2017
JWG B5/D2.67 Time in Communication Networks, Protection and Control Applications JWG B5/D2.67 TOR A. Heffernan 2018

 

Study Committee Category: Electricity System and the Energy Market ( C )

 

Study Committee C1: System development and economics
SC Representative   Mario Duarte
Working Group No. Working Group Title WG Terms of Reference (TOR) Irish Representative Year appointed to WG
WG C1.33 Interface & Allocation Issues in multi-party and/or cross-jurisdiction power infrastructures proje WG C1.33 TOR A. McHugh 2014
JWG C1/C4.36 Review of Large City & Metropolitan Area power system development trends taking into account new generation, grid and information technologies JWG C1/C4.36 TOR M. Coone 2017
WG C1.39 Review of Large City & Metropolitan Area power system development trends taking into account new generation, grid and information technologies WG C1.39 TOR N. Cunniffe (Full), J. MacEnri (corresponding) 2017
WG C1.40 Interface & Allocation Issues in multi-party and/or cross-jurisdiction power infrastructures proje WG C1.40 TOR E. Lannoye, T. Gallery 2017
Study Committee C2: System operation and control
SC Representative   Maria Madders
Working Group No. Working Group Title WG Terms of Reference (TOR) Irish Representative Year appointed to WG
JWG C2/C6.36 System Operation Emphasizing DSO/TSO Interaction and Co-Ordination JWG C2/C6.36 M. Power (Convenor)
S. Power,  T. Hearne, E. Lannoye, E. Diskin
2015
JWG C2/B4.38 Capabilities and requirements definition for Power Electronics based technology for secure and efficient system operation and control JWG C2/B4.38 H. Qazy, M. Val Escudero (Corresponding) 2017
Study Committee C3: System environmental performance
SC Representative   None
Working Group No. Working Group Title WG Terms of Reference (TOR) Irish Representative Year appointed to WG
WG C3.15 Best environmental and socio-economic practices for improving public acceptance of high voltage substations WG C3.15 TOR B. Wall 2014
WG C3.16 Interactions between Electrical Infrastructure and Wildlife WG C3.16 TOR P. Kavanagh, M. Flynn 2016
WG C3.19 Responsible management of the Electric and Magnetic Field Issue WG C3.19 TOR R. Arthur 2018
Study Committee C4: System technical performance
SC Representative   Marta Val Escudero
Working Group No. Working Group Title WG Terms of Reference (TOR) Irish Representative Year appointed to WG
WG C4.23 Guide to Procedures for Estimating the Lightning Performance of Transmission Lines WG C4.23 TOR B. Hanratty 2012
WG C4.28 Extrapolation of measured values of power frequency magnetic fields in the vicinity of power links WG C4.28 TOR R. Arthur 2012
JWG C4.31/CIRED EMC between communication circuits and power systems JWG C4.31/CIRED TOR C. McNamee, K. Atkinson 2012
JWG C4/B4.38 Network modelling for Harmonic Studies JWG C4/B4.38 TOR M. Val Escudero (Convenor),  J. Ging 2015
JWG C4.40-CIRED Revisions to IEC Technical Reports 61000-3-6, 61000-3-7, 61000-3- 13, and 61000-3-14 JWG C4.40/CIRED TOR A. Martin – (Regular), M. Val Escudero (Corresponding) 2015
JWG C4.48 EMC between communication circuits and power systems JWG C4.48 TOR I. Dudurych (Convenor) 2017
Study Committee C5: Electricity markets and Regulation
SC Representative   Aodhagan Downey
Working Group No. Working Group Title WG Terms of Reference (TOR) Irish Representative Year appointed to WG
C5.20 Drivers for Major Changes in Electricity Markets  WG C5.20 TOR R. McCarthy 2015
C5.21 Impacts of Environmental Regulations on Power Markets  WG C5.21 TOR C. Goodman 2015
 C5.24 Exploring the Market-based value of Smart Grid developments  WG C5.24 TOR L. Breathnach  2017
Study Committee C6: Distribution systems and Dispersed generation
SC Representative   Ivan Codd
Working Group No. Working Group Title WG Terms of Reference (TOR) Irish Representative Year appointed to WG
WG C6.30 The Impact of Battery Energy Storage Systems on Distribution Networks  WG C6.30 TOR R.Aherne 2014
JWG C1/C6.37/CIRED Optimal transmission and distribution investment decisions under increasing energy scenario uncertainty JWG C1/C6.37/CIRED TOR M. Duarte, B. Kelly 2017

Study Committee Category: Information Technology and “New” Technology ( D )

Study Committee D1: Materials and Emerging Test Techniques
SC Representative   No Representative
Working Group No. Working Group Title WG Terms of Reference (TOR) Irish Representative Year appointed to WG
WG D1.71 Understanding and mitigating corrosion WG D1.71 TOR L. Walsh, S. Flood 2017
Study Committee D2: Information systems and Telecommunication
SC Representative   Karen McGeough
Working Group No. Working Group Title WG Terms of Reference (TOR) Irish Representative Year appointed to WG
WG D2.42 Synchronization and time distribution in communication networks  for time-sensitive distributed operational applications in the power grid WG D2.42 TOR T. Gray 2016
 WG D2.44 Usage of Public or Private Wireless Communication Infrastructures for Monitoring and Maintenance of Grid Assets and Facilities  WG D2.44 TOR P. Mulvey (Convenor)  2017